| Absolut Resources Corp. (TSX
VENTURE:ABS) is pleased to announce that the Company
has received drilling results from the first ten
holes of its Phase Three reverse circulation drill
program completed on the Pico Machay, High
Sulphidation Gold Project in Peru. Highlights of the
drilling include holes ABS-128 intersecting 76m @
1.06 g/t Au and ABS-131 intersecting 33m @ 1.19 g/t
Au and 54m @ 1.24 g/t Au.
Also of note was hole ABS-126 which is located to
the north of the dacite dome (500m north of the
Central Zone), which intersected 12m @ 2.66 g/t Au.
Further drilling will need to be completed to
determine the extent of this mineralisation which
appears to be located along the northern contact of
the dacite and the intruded volcanic pile.
Mineralisation in the Central Zone has been
extended eastward with ABS-135 intersecting 30m @
2.32 g/t Au. The mineralisation remains open to the
northeast.
For drill hole locations and sections please
click here:
http://www.absolutresources.com/news/2005/pr_image060805.htm
Drill results, calculated using a 0.3 g/t Au
cut-off and up to 1.5m of internal dilution are as
follows:

As a reference, the Newmont / Buenaventura
Yanacocha high sulphidation gold mine has an overall
grade of 0.96 g/t Au and Barrick's Alto Chicama
deposit grades 1.39 g/t Au.
The Phase Three drill program currently in
progress is designed to extend and confirm the
continuity of the Central Zone, which covers an area
of 800m by 300m, and to test additional target areas
to the north and west of the Central Zone.
Absolut's wholly owned subsidiary, Minera Calipuy
SAC has an agreement with Monterrico Metals PLC to
earn up to a 75% interest in the Pico Machay gold
project.
Absolut has implemented a quality control program
to ensure best practice in chemical sampling and
analysis of surface and reverse circulation drilling
samples.
Absolut Resources Corp. is a precious metals
exploration and development company based in
Toronto, Canada. Absolut strongly believes in an
international best practices approach, and
implements this on all its social and environmental
decisions. Absolut has implemented a quality control
program to ensure best practice. The required
qualified person for the Pico Machay Gold Project is
Mr. Dan Noone who is a member of the Australian
Institute of Geoscientists.
This press release contains forward looking
statements.
For any questions or comments please contact
us directly.
|