Press Releases

Related News

Drill out completed at Pico Machay plus positive metallurgy testwork

November 19, 2007

Absolut Resources Corp. (TSX-V: ABS) is pleased to report the final results from the definition drilling program on the Pico Machay Gold Project in Peru. It also reports that preliminary metallurgical testwork on Pico Machay samples has indicated that cyanide leaching would yield good recoveries of gold and silver.

 

The drilling confirms the continuity of near surface mineralization which, supported with favourable preliminary metallurgical results, demonstrates the feasibility of a low capital cost, heap leach operation at Pico Machay.

 

Highlights of the drilling were holes ABS-242 intersecting 100m @ 0.83 g/t Au, including 7.5m @ 2.13 g/t Au and 27m @ 1.26 g/t Au; ABS-234 intersecting 80.5m @ 0.71 g/t Au, including 16.5m @ 1.46 g/t Au. All results are tabulated below:

 

Pico Machay Drill Hole Gold Grade Summary

Hole

 

From (m)

To (m)

Length (m)

Gold Grade (g/t)

ABS-231

 

8.5

35.5

27.00

0.33

 

 

58.0

100.0

42.0

0.34

ABS-232

 

0.0

88.0

88.0

0.70

 

Including

53.5

71.5

18.0

1.75

ABS-233

 

0.0

80.5

80.5

0.43

 

Including

20.5

26.5

6.0

1.12

ABS-234

 

0.0

80.5

80.5

0.71

 

Including

1.0

17.5

16.5

1.46

 

Including

67.0

71.5

4.5

1.05

ABS-235

 

13.0

31.0

18.0

0.44

 

 

41.5

52.0

10.5

0.32

 

 

58.0

82.0

24.0

0.39

ABS-236

 

0.0

100.0

100.0

0.44

ABS-237

 

0.0

47.5

47.5

0.42

 

 

55.0

67.0

12.0

0.33

 

 

79.0

89.5

10.5

0.50

ABS-238

 

0.0

37.0

37.0

0.36

 

 

61.0

80.5

19.5

0.50

ABS-239

 

0.0

23.5

23.5

0.62

 

Including

8.5

16.0

7.5

1.57

 

 

28.0

38.5

10.5

0.35

ABS-240

 

4.0

25.0

21.0

0.61

ABS-241

 

0.0

41.5

41.5

0.90

 

Including

0.0

4.0

4.0

1.47

 

Including

22.0

31.0

9.0

1.50

ABS-242

 

0.0

100.0

100.0

0.83

 

Including

17.5

25.0

7.5

2.13

 

Including

41.5

68.5

27.0

1.26

ABS-243

No Significant

 

 

 

 

ABS-244

 

0.0

56.5

56.5

0.56

 

Including

22.0

40.0

18.0

1.04

 

Including

65.5

100.0

34.5

0.40

ABS-245